Over 500+ solar power and industrial aluminum projects successfully completed
5MWp Solar Power Project in Bac Ninh
Challenge
EPC contractor needed complete mounting structure package for 5MWp project in short time (2 months) with optimized costs. Complex terrain with flat factory roofs and tilted metal roofs. Required to ensure construction schedule and international quality standards.
Solution
Provided complete A6005-T6 aluminum mounting package including: 4.2m rails, flat roof ballast mounts, L-feet for tilted roofs, mid/end clamps, grounding accessories and stainless steel bolts. Free technical design support, structural calculations per AS/NZS 1170. Delivery in 3 batches matching construction schedule. 24/7 on-site technical team support.
"Quang Minh is a reliable partner for our EPC project. High-quality A6005-T6 aluminum mounting, 30% more competitive than imports. Especially the free technical design service and on-time delivery helped us complete the project 1 month early. After 2 years of operation, the system remains absolutely stable."
2MWp Tilted Roof System in Urban Area
Challenge
Project to install solar system on 150 villa roofs with different angles and roof types (tile, metal, concrete). High aesthetic requirements, no damage to existing roof structure, absolute waterproofing. Contractor needed flexible and easy-to-install solution to save labor.
Solution
Designed versatile tilted roof mounting system with adjustable L-feet (10-30 degrees), suitable for all roof types. Provided complete: aluminum L-feet, tile hooks for tile roofs, specialized roofing screws, EPDM rubber gaskets for waterproofing. Detailed installation guidance and technical support at 5 simultaneous construction points. Flexible delivery according to each housing cluster schedule.
"Quang Minh's tilted roof mounting system is very intelligently designed, easy to install, helping us save 40% labor compared to plan. High-quality A6005-T6 aluminum withstands storms well. Especially the flexible delivery service and enthusiastic technical support helped complete the project 2 weeks early."
10MWp Flat Roof Project in Hai Phong
Challenge
Contractor's largest project, installation on 50,000m² flat factory roof. High load requirements due to coastal location (5km from sea), level 12 wind resistance, salt corrosion. Absolute safety required, no roof drilling to avoid leaks. Tight construction time (3 months) to catch FIT price.
Solution
Provided specialized ballast block flat roof mounting system, no roof drilling needed. Detailed technical calculations per AS/NZS 1170 standards for level 12 wind and 1.5kN/m² snow load. Used A6005-T6 aluminum with 15µm anodized layer for salt corrosion resistance. Complete package: concrete ballast blocks, 4.2m rails, mid/end clamps, grounding wire, 316 stainless steel bolts. 5 engineers on-site support throughout construction.
"This is our largest project and Quang Minh proved to be a reliable partner. Ballast flat roof mounting intelligently designed, bears loads well, installs twice as fast as old systems. Technical team provided detailed calculations ensuring absolute project safety. Thanks to that we completed the project on time and achieved COD certification timely."